Portfolio

Bradley Residence, Carmel, CA
Residential radiant heat installation by New Heat Engineering, Inc.
System installed: High Effiency Condensing Boiler System with Vision I Control
September 2007
Manifold Assembly

Bradley Residence, Carmel, CA
HePEX pipe is layed on the subfloor prior to the finish flooring.
Manifold Assembly

Bradley Residence, Carmel, CA
Radiant system provides warmth to the finished tile stone floor.
Manifold Assembly

Munchkin Boiler (399)
High Effiency Condensing Boiler System with Vision III Control
Start-up and programming by New Heat Engineering, Inc.
Installation by Merril Lynch Mechanical
Altenhein House, Oakland, CA
Manifold Assembly

Prototype of the Phoenix Solar Hot Water Generator
Showcased at Hydronics Specialty Company (HSC) Oakland, CA
This system provides low cost and high effiency solar heating.
Phoenix qualifies for federal tax credits.
Manifold Assembly

Munchkin VISION 1 System, Radiant Floor Heating
Manifold Assembly
Pebble Beach, CA
January 2006
Manifold Assembly

Munchkin VISION 1 System, Radiant Floor Heating
proPanel (tm) Pipework
Carmel Heights, CA
March 2006
Manifold Assembly